Sunday, April 27, 2014

Glad it rained


Glad we got some rain.  The course was getting pretty dry. We have seeded the winter damage on the greens and have had to water them with our spray tank.  Progress is moving on the pump house.  We are scheduled for an electrical inspection this Tuesday.  After that we can call Orange and Rockland to turn on the power.  Once that is done we will call the pump company and have them calibrate the pumps.  It is time to get the system going and we are working on it as fast as we can.  

Winter damage on greens is getting better but we have a long way to go.  Cold soil temperatures have made seed germination slow.  We are doing everything we can.  

Pump house ready for electrical inspection on Tuesday.  

Starting to take shape.  Needs roof material, painting and landscaping.   

15 green --getting better.  

14 green --also better but a long way to go.